An algorithm for optimizing the mining schedule has been developed using the example of the "Vostochnyi" coal mine of the Ekibastuz region to implement the technology of safe intensive development of working zones along the steep open pit edge. Optimization operations of the mining operations mode and the transformation of its results into a mining schedule are combined in one algorithm. It will allow technical service to adjust the approved project schedule of mining operations at the end of each calendar year, depending on the actual volumes of coal mining and overburden excavation with recalculation of the required stripping volumes. Thus, this method of rapid assessment of design solutions while combining optimization of the open pit-mining mode and the schedule of their production allows, with a change of demand on commercial products, to correct the required volumes of stripping operations, taking into account the production rhythm of overburden, mining and mining preparatory operations.
机译:利用Ekibastuz地区“Vostochnyi”煤矿的示例开发了一种优化采矿时间表的算法,以实现沿着陡峭坐坑边缘的工作区安全密集型发展的技术。挖掘操作模式的优化操作和其结果转换为挖掘计划的变换在一种算法中组合。它将允许技术服务在每个日历年结束时调整批准的采矿业务计划时间表,具体取决于煤炭采矿的实际卷和覆盖挖掘,重新计算所需的剥离量。因此,这种快速评估设计解决方案的方法,同时结合了开放式挖掘机模式的优化和其生产的时间表,通过对商业产品的需求变化,以纠正所需的剥离操作,同时考虑到生产节奏的覆盖层,采矿和采矿准备运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号