首页> 外文会议>European concurrent engineering conference >RT Simulation of Wind Power Station with NI Lab VIEW
【24h】

RT Simulation of Wind Power Station with NI Lab VIEW

机译:NI实验室视图的风电站RT仿真

获取原文

摘要

The paper presents a Real-Time MIL (Model-In-The-Loop) test approach for a DFIG (Doubly-Fed Induction Generator) wind turbine system by modelling the power grid, controller, wind turbine, drive and wound rotor AC induction machine, and simulating the wind signal. The practical target is to find the best way to extract as much energy as possible by optimizing the controller model behavior for various fluctuations of wind speed, sweeping from low wind speed when the turbine extracts less energy from the wind, and high speed when the turbine will limit its energy utilization to keep the extracted energy at the maximum allowable level.
机译:本文通过建模电网,控制器,风力涡轮机,驱动器和缠绕转子AC IC感应机,提供了一种实时MIL(换档换档型机器)风力涡轮机系统的测试方法。 ,并模拟风力信号。实际目标是通过优化控制器模型行为来找到尽可能多的能量的最佳方法,以便在涡轮机从风中提取较少的能量时从低风速从低风速下放,以及涡轮机时的高速将限制其能量利用,以使提取的能量保持在最大允许水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号