Ridge Regional Water Supply: 140-Mile Pipeline Brings Water for the Next Generation

机译:岭地区供水:140英里的管道为下一代带来水

获取原文

摘要

This water supply project is an example of a successful private-public partnership. This paper describes the design and permitting solutions, and design-build contracting tools used to meet an aggressive project schedule. This paper will describe the challenges with a concurrent design-build, land acquisition, and permitting process. This water supply will provide over 44-million gallons of water per day from Central Texas to the San Antonio region. The Vista Ridge water supply project is a public-private partnership (P3) with the San Antonio Water System (SAWS). The project included private financing to design and build the new water system. The system will be privately operated for 30 years. The project included extensive design analysis and recommendations to deliver a 44-MGD groundwater supply through a 140-mi transmission main system. The project includes a wellfield with 18 wells delivering raw groundwater to a water treatment plant. The groundwater source is cooled, disinfected, and treated for stability. The water is pumped over 140-miles through a 54- and 60-in. water transmission main. The project includes three (3) pump stations. The project delivery included a fast-paced land acquisition and permitting process. This process occurred concurrently with the alignment design and hydraulics and surge analysis. A methodology for landowner coordination, environmental clearance, alignment, and hydraulic verification was developed for a large design team. The 140-mi pipeline alignment was divided into 16 construction packages that were established for the concurrent construction with five (5) contractor crews. This paper describes a successful approach to designing and constructing a P3 water supply project. The project included close coordination with the public agency during a fast-paced concurrent design and construction project. This included iterative reviews, multi-agency approvals, and a documentation process for field adjustments during construction. The project included a robust construction SharePoint site for facility team members. It also included a computerized maintenance management system (CMMS) design, fiber optic communication and SCADA system, and extensive power coordination with three (3) utility providers over seven (7) counties in Texas.
机译:这种供水项目是成功私有公共伙伴关系的一个例子。本文介绍了设计和允许的解决方案,以及用于满足攻击性项目时间表的设计 - 构建承包工具。本文将描述与并发设计建立,征地和允许流程的挑战。该供水将从德克萨斯州中部到San Antonio地区每天提供超过4400万加仑的水。 Vista Ridge供水项目是一个公私伙伴关系(P3),San Antonio水系统(锯)。该项目包括私人融资来设计和建造新的水系统。该系统将私下运营30年。该项目包括广泛的设计分析和建议,通过140英里传输主系统提供44 MgD地下水供应。该项目包括一个带18个井的井场,将原始地下水输送到水处理厂。地下水源被冷却,消毒和治疗稳定性。水通过54-和60英寸泵送超过140英里。潮流的主要。该项目包括三(3)个泵站。项目交付包括快节奏的土地收购和允许流程。该过程同时发生对准设计和液压和浪涌分析。为一个大型设计团队制定了土地所有者协调,环境清关,对准和水力验证的方法。将140英里的管道对齐分为16个建筑套件,该套件是为五(5)人承包商船员的并行结构建立的。本文介绍了设计和构建P3供水项目的成功方法。该项目包括在快节奏的并行设计和建筑项目中与公共机构密切协调。这包括迭代评论,多机构批准和建设期间的现场调整的文件流程。该项目包括适用于设施团队成员的强大建筑SharePoint网站。它还包括计算机化维护管理系统(CMMS)设计,光纤通信和SCADA系统,以及德克萨斯州德克萨斯州多七(7)个县的三(3)个公用事业提供商的广泛电力协调。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号