首页> 外文会议>Student Conference on Electrical Machines and Systems >Multi-objective Coordinated Operation for Multi-Energy Hub Considering Heat Network Model
【24h】

Multi-objective Coordinated Operation for Multi-Energy Hub Considering Heat Network Model

机译:考虑热网模型的多能量枢纽多目标协调运行

获取原文

摘要

Energy Hub is an important part of the energy conversion supply process, which integrates multi energy forms to effectively improve energy efficiency. In order to improve the efficiency of energy utilization and also consider the cost, a multi-objective optimization model including exergy loss and operation cost is established. Due to EH and users are connected by heat network, the thermal network is modeled. A heat network model which considers the time delay and loss is established, and multiple types of thermal loads has been considered. Thus, a multi-objective coordinated operation framework for multi-EH considering thermal network model is proposed. Further, a method to solve the Pareto front and a reference method based on Nash bargain for selecting a final result is given, which can be easily solved by CPLEX. Finally, numerical studies with three EHs demonstrate the effectiveness of the proposed method.
机译:能量枢纽是能量转换供应过程的重要组成部分,其集成了多能量形式,以有效提高能效。为了提高能源利用效率并考虑成本,建立了包括漏洞损失和运营成本的多目标优化模型。由于EH和用户通过加热网络连接,热网络被建模。建立了一种热网络模型,其建立了时间延迟和损耗,并考虑了多种类型的热负荷。因此,提出了考虑热网络模型的多eh的多目标协调操作框架。此外,给出了用于求解基于NASH BARGAIN用于选择最终结果的Pareto正面的方法和参考方法,其可以通过CPLEX容易地解决。最后,具有三个EHS的数值研究证明了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号