Trans Mountain Corporation utilizes the complete range of trenchless methodologies to realize the Trans Mountain Expansion Project (TMEP) Pipeline

机译:Trans Mountain Corporation利用完整的挖沟方法来实现跨山地扩建项目(TMEP)管道

获取原文

摘要

The original NPS 24 Trans Mountain Pipeline was constructed in 1953. Other than some basic tunneling, majortrenchless construction was not available at that time for the oil and gas pipeline industry. This year, 2020, TransMountain Corporation has started construction of the Trans Mountain Expansion Project (TMEP) pipeline. Thispipeline project involves almost 893 kilometres (555 miles) of NPS 36 and 122 kms (76 miles) of NPS 42 pipelinefor a total length of 1015 kms or 630 miles. The pipeline extends from Edmonton, Alberta to Burrard Inlet inVancouver, BC. Major trenchless crossing construction is helping to make this pipeline possible, including a 2600meter long (1.62 miles) TBM tunnel, as much as 1300 meters (4265 feet) of MTBM microtunneling, 2500 meters(8202 ft) of Direct Pipe, 33,000 meters (20.5 miles) of Horizontal Directional Drilling (HDD), as well as HorizontalDirectional Boring (HDB) and all of the more conventional boring methods. A pipeline project with this magnitudeof trenchless construction has never been attempted before in North America and possibly anywhere and only thesecond time has a pipeline been constructed from Alberta to the BC coast. This paper will describe the process oftrenchless selection and design for this world class project and some of the major routing, geological andgeotechnical issues that had to be overcome.
机译:原始的NPS 24跨山管道于1953年建造。除了一些基本的隧道之外,主要当时当时提供开拓建设,用于石油和天然气管道行业。今年2020年,跨山地公司已经开始建造跨山扩建项目(TMEP)管道。这个管道项目涉及近893公里(555英里)的NPS 36和122公里(76英里)的NPS 42管道总长度为1015公里或630英里。管道从艾伯塔省Edmonton延伸到伯拉德入口温哥华,BC。主要的横跨横穿建筑有助于使该管道成为可能,包括2600电表长(1.62英里)TBM隧道,多达1300米(4265英尺)的MTBM Microtunneling,2500米(8202英尺)直接管道,33,000米(20.5英里)的水平定向钻孔(HDD),以及水平定向镗孔(HDB)和所有更传统的镗孔方法。具有这种幅度的管道项目在北美之前从未尝试过北美建筑,并且可能只有在任何地方第二次从艾伯塔省建造了一条管道到BC海岸。本文将描述该过程这个世界级项目的绝尘选择和设计和一些主要路线,地质和地质必须克服的岩土问题。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号