Since 2016, a developer in Tampa, Florida, has been involved in a major facility expansion, which includes new parking garages, an elevated Porte Cochere, a central utility plant, a three-story low-rise expansion, and a new 17-story hotel tower. Constructing the expansion structures while maintaining an operational facility presented its own set of unique complications. Because of numerous geotechnical challenges, extensive coordination was required among the design team, ownership, specialty subcontractors, and general contractor to meet the rigorous project demands. The challenging subsurface conditions included highly variable strength characteristics typical of the underlying Tampa limestone formation, karst features within the formation, and the potential for destabilization of the working platform by construction-induced subsidence related to the selected foundation or ground-improvement system installation. All these factors needed to be considered and implemented with regard to potential impacts to adjacent structures supported on a variety of foundation systems. Geologic anomalies such as zones of highly atypical depths to the limestone bearing stratum and interbedded zones of variable infill materials were also encountered. These conditions required specialized construction techniques and a highly skilled team working together. To accomplish the project goals, a number of geotechnical solutions were used including drilled shafts, augered cast-in-place (ACIP) piles, micropiles, vibro-replacement stone columns, and low-mobility grouting as well as deep soil-mixing, tiebacks, and chemical-grout stabilization for support of excavation. To effectively implement a wide range of foundation and ground-improvement solutions, an extensive subsurface investigation was performed followed by comprehensive load testing. Production-phase non-destructive testing for each of the various foundation components was included along with supplemental load testing. An overview of the development concept and a description of each of the geotechnical challenges encountered, the approaches formulated, and subsequent use of each solution is presented here. Additionally, load-test results for drilled shafts will be compared to load-test data from other parts of the Tampa Bay region to highlight the complexity of the project. Non-destructive test results will validate the specialized construction techniques that were required. The paper will provide a case study of how the various subsurface challenges typical to the Tampa region can be overcome in a practical manner through proper communication and planning while meeting the schedule and coordination demands of the project.
机译:自2016年以来,佛罗里达州坦帕市的开发商参与了一项重大设施扩建,其中包括新的停车场,高架的Porte Cochere,中央公用事业厂,三层低层扩建以及新的17层酒店塔。在维持运营设施的同时建造扩展结构会带来一系列独特的复杂情况。由于众多的岩土工程挑战,设计团队,所有权,专业分包商和总承包商之间需要进行广泛的协调,以满足严格的项目要求。富有挑战性的地下条件包括潜在的坦帕石灰石地层典型的高度可变的强度特征,地层内的岩溶特征以及与所选基础或地面改善系统安装相关的施工引起的沉降可能使工作平台失稳。需要考虑和实施所有这些因素,以应对各种基础系统所支撑的相邻结构的潜在影响。还遇到了地质异常,例如石灰岩承压层的非典型深度极高的区域以及可变填充材料的夹层区域。这些条件需要专业的施工技术和一支技术精湛的团队共同努力。为了实现项目目标,使用了许多岩土工程解决方案,包括钻探井筒,直立式现浇(ACIP)桩,微型桩,振捣石柱,低流动性注浆以及深层土壤搅拌,回填以及化学灌浆的稳定作用以支持开挖。为了有效地实施各种基础和地面改善解决方案,进行了广泛的地下调查,然后进行了全面的载荷测试。包括对各种基础组件中的每个组件的生产阶段无损测试以及补充负载测试。这里介绍了开发概念的概述以及遇到的每种岩土工程挑战,制定的方法以及每种解决方案的后续用法。此外,还将对钻探轴的载荷测试结果与坦帕湾地区其他地区的载荷测试数据进行比较,以突出该项目的复杂性。无损检测结果将验证所需的专业建造技术。本文将提供一个案例研究,说明如何通过适当的沟通和计划,同时满足项目的进度和协调要求,以实际的方式克服坦帕地区典型的各种地下挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号