A new primary crusher was built for a copper mine expansion project in the Peruvian Andes. The crusher is housed in a new reinforced concrete structure supported on a 1.8-m thick mat with rectangular plan dimensions of 19 m×38 m. A mechanically stabilized earth (MSE) wall of 30 m height was built around 3 sides of the crusher to facilitate the dumping of rock materials for crushing. A settlement monitoring system was installed on the crusher foundation, and monitoring started when the MSE wall was 10m high. The new crusher settlements were roughly estimated using the average anticipated loading on the crusher foundation prior to construction. The foundation soil parameters were extracted from SPT blow counts obtained from a hammer with non-standard weight. The measured settlements were smaller than the estimated. In this paper, the settlement calculation was performed using 3D simulation and it considered the MSE wall and crusher loading on the crusher foundation. The calculated settlements from 3D modeling are compared with the measured ones, and they are in reasonable agreement in four corners of the crusher foundation.
机译:为秘鲁安第斯山脉的铜矿扩建项目建造了新的主破碎机。该破碎机安装在一个新的钢筋混凝土结构中,该结构支撑在1.8 m厚的垫层上,矩形平面尺寸为19 m×38 m。在破碎机的3面周围建造了30 m高的机械稳定的土(MSE)墙,以方便倾倒岩石材料进行破碎。在碎石机基础上安装了沉降监测系统,并在MSE墙高10m时开始监测。新破碎机的沉降量是根据施工前破碎机基础上的平均预期载荷进行粗略估算的。从用非标准重量的锤子获得的SPT打击计数中提取基础土壤参数。测得的沉降量小于估计值。在本文中,沉降计算是使用3D模拟进行的,其中考虑了MSE壁和破碎机基础上的破碎机载荷。将通过3D建模计算出的沉降与所测得的沉降进行比较,并且它们在破碎机基础的四个角处合理地吻合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号