Introduction to the South African Renewable Energy Grid Code version 2.9 requirements (Part I — Introduction)

机译:南非可再生能源网格代码版本2.9要求介绍(第一部分 - 介绍)

获取原文

摘要

Under-frequency load shedding, rising electricity tariffs, environmental concerns and delays in constructing new power stations had plunged South Africa into darkness with the need for load shedding. Renewable energy technologies with its short lead times have become an attractive alternative for the country and hence led to the South African Government calling upon the country to explore renewable energy generation options. Subsequently, the Integrated Resource Plan 2010 set a target of 17800 MW (equivalent to 42%) of new electricity generation capacity to be derived from renewable energy sources. The Renewable Energy Independent Power Producer Procurement Program was then introduced with the aim of procuring Independent Power Producers clean renewable energy generation. The South African Renewable Energy Grid Code was then developed in 2010 to assist with these new Renewable Power Plants connecting onto the grid. The purpose of this paper is to provide details into the Renewable Energy Independent Power Producer Procurement Program, the South African Renewable Energy Grid Code requirements and provide practical testing methods to carry out grid code compliance in accordance with the code.
机译:频率不足负担,电力资费上升,环境问题和建造新发电站的延误将南非陷入了黑暗,需要负载脱落。可再生能源技术,其交易时间短,已成为该国有吸引力的替代方案,因此导致南非政府呼吁该国探索可再生能源发电期权。随后,集成资源计划2010设置了17800 MW(相当于42 %)的新发电能力的目标,以衍生自可再生能源。然后,可再生能源独立电力生产者采购计划随着采购独立电力生产商清洁可再生能源生成的目的。然后在2010年开发了南非可再生能源网格码,以协助连接到电网上的这些新的可再生电厂。本文的目的是提供详细信息进入可再生能源独立电力生产商采购计划,南非可再生能源网格代码要求,并提供了根据代码进行网格代码合规性的实用测试方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号