When a project is initiated, one can expect to encounter challenges - that is a given. This was the case for BNSF bridges 69.0 and 71.3 in neighboring Franklin and Osage Counties in Kansas. Bridge 69.0 is a single 200' pin-connected through truss that carries double main tracks and the new structure consists of deck plate girder and precast concrete double box beam spans totaling 317'-3". The existing Bridge 71.3 consists of seven spans combination of precast concrete, steel and 150' truss spans for a total of 269'-6" between bulkheads. The new Bridge 71.3 has four spans of deck plate girders for a total length of 291'-3" between abutments. Due largely to record train volumes a redesign was requested. Project challenges included re-survey and design of structural, track, and site civil, re-permitting, ROW acquisition, re-evaluating construction cost bid items and changing overall scope of construction, engineering, and owner involvement. This presentation will detail numerous challenges encountered and lessons learned including: 1) Details on the in-line change out to off-line construction 2) Adaptability of all parties involved to overcome issues 3) Working safely within time/work constraints around train traffic and Owner Schedule 4) Take away - Lessons learned from this unique scenario and expectations on similar future bridge replacement projects. Working through these challenges has been key to maintaining safety, quality, budget, schedule, and the overall success of the project.
机译:当一个项目开始时,人们可能会遇到挑战-这是既定的。堪萨斯州相邻的富兰克林县和奥塞奇县的BNSF桥梁69.0和71.3就是这种情况。桥梁69.0是通过桁架通过单个双脚架进行200'销连接的新结构,新结构包括甲板大梁和预制混凝土双箱梁跨度,总计317'-3“。现有的桥梁71.3由七个跨度组合组成预制混凝土,钢和150'桁架跨度,舱壁之间的总跨度为269'-6“。新的71.3桥有四个跨度的桥面大梁,桥台之间的总长度为291'-3“。由于列车的记录量很高,因此需要重新设计。项目挑战包括结构,轨道和工地的重新勘测和设计土建,重新许可,ROW购置,重新评估建筑成本投标项目以及改变建筑,工程和业主参与的总体范围此演示文稿将详细介绍所遇到的众多挑战和经验教训,包括:1)在线变更的详细信息脱机施工2)各方的适应性以克服问题3)在时间和工作范围内围绕火车交通和船东时间表进行安全工作4)带走-从这种独特的情况中学到的经验教训以及对未来类似桥梁更换项目的期望应对这些挑战对于维持安全性,质量,预算,进度和项目的整体成功至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号