REMOTE MONITORING AND REPLACEMENT OF NORFOLK SOUTHERN BRIDGE CF-35.40 OVER COTTON RUN, SEVEN MILE, OH

机译:俄亥俄州七英里以上的棉麻径诺福克南桥CF-35.40的远程监测和更换

获取原文

摘要

A storm event on May 24th, 2017 resulted in extreme flooding of Cotton Run that nearly overtopped the existing rails of the Norfolk Southern Bridge CF-35.40 in Seven Mile, OH. The existing structure was 92 years old and comprised of three (3) 22'-6" concrete slab beam spans supported on concrete piers and concrete gravity abutments carrying one main line track. This flood exceeded the 100-year flood elevation by several feet and created a scour condition at the base of the East Pier. The East Pier settled more than one foot, with a corresponding distortion of the superstructure resulting in loss of support at track level. Norfolk Southern immediately installed timber cribbing and rip rap around the pier to restore service under reduced speeds. A remote-monitored structure monitoring system was installed on the bridge while permanent improvements were developed. The remote monitoring system worked as a warning system if the bridge were to experience further loss of support and was in service until the superstructure could be replaced. The replacement span is a 52'-0", single span, through-girder bridge supported on precast concrete abutment seats and 5'-0" diameter drilled shafts. The design accommodated construction of drilled shaft foundations outside the footprint of the existing bridge to allow uninterrupted track service during foundation installation. The superstructure was replaced within a 24-hr planned outage on May 21, 2018, nearly one year after the storm event. This paper outlines the benefits and lessons learned from the structure monitoring system and accelerated bridge construction approach.
机译:2017年5月24日的一场风暴事件导致棉花奔跑的极端洪水,几乎超过了俄亥俄州七英里的诺福克南桥CF-35.40的现有轨道。现有结构已有92年的历史,由三(3)个22'-6“混凝土平板梁跨度支撑,支撑在混凝土墩台和带有一条干线轨道的混凝土重力桥台上。此次洪水超出了100年的洪水高度,达数英尺,在东码头的底部形成了冲刷条件,东码头沉降了超过一英尺,上部结构也相应变形,导致在轨道水平上失去了支撑,诺福克南方航空公司立即在码头周围安装了木桩和翻录装置。在降低速度的情况下恢复服务:在桥梁上安装了远程监视的结构监视系统,并进行了永久性的改进;如果桥梁要进一步失去支撑并在上层建筑中投入使用,则远程监视系统可以作为警告系统可以更换。更换跨度为52'-0“单跨跨梁桥,支撑在预制混凝土基台座椅和5'-0” di直径钻孔轴。该设计可在现有桥梁的占地面积之外进行钻孔竖井基础的施工,以在基础安装过程中提供不间断的轨道服务。在风暴事件发生近一年后的2018年5月21日,有24小时计划停机期间更换了上层建筑。本文概述了从结构监测系统和加速桥梁施工方法中获得的收益和教训。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号