首页> 外文会议>ASME Power Conference >CHANGE YOUR MAINTENANCE PHILOSOPHY WHEN YOU CONVERT A BASE LOADED UNIT TO CYCLING OPERATION
【24h】

CHANGE YOUR MAINTENANCE PHILOSOPHY WHEN YOU CONVERT A BASE LOADED UNIT TO CYCLING OPERATION

机译:当您将基本加载的单元转换为循环操作时,更改维护哲学

获取原文

摘要

With the fuel prices going up and many states mandating use of more renewable energy, a number of utilities are forced to convert some of their base loaded units to cycling operation. This change in operation requires a departure from the standard maintenance practices established for a given unit. This includes changes to Preventative Maintenance (PM), Predictive Maintenance (PdM), Planning and Scheduling and Key Performance Indicators (KPIs). When a unit is cycled - either minimum load to maximum load or two shift operation - it goes through stress cycles and its expected life decreases relative to the severity of cycling. When a decision is made to cycle a base loaded unit, the impact of the cycling has to be analyzed and the PM and PdM procedures need to be modified in order to maintain the expected life of the components. Cycling affects different components to different degrees and appropriate inspection and maintenance schedules need to be developed. The Key Performance Indicators (KPIs) have to be modified to monitor the effectiveness of the inspections and maintenance performed on the equipment. For example, Maintenance Basis Violation (MBV) is an important KPI for a cycling unit. Similarly, more attention has to be paid to the Planning and Scheduling activities as there are many uncertainties in the availability of the unit for preventative maintenance. The paradigm of performing PMs on a time basis should be changed to a throughput or hours of operation basis. This paper reviews the impact and severity of different cycling modes on a unit, vulnerability of common components adapting to the new mode, and discusses - in general terms - the required changes which need to be made in the inspection and maintenance practices. Also the paper reviews various KPIs that can be put in place for monitoring the impact of these procedures.
机译:随着燃料价格上涨和许多授权使用更可再生能源的州,许多公用事业都被迫将其一些基础装载单元转换为骑自行车操作。这种操作的变化需要偏离为给定单元建立的标准维护实践。这包括对预防性维护(PM),预测维护(PDM),规划和调度和关键绩效指标(KPI)的更改。当一个单元循环时 - 最小负载到最大负载或两个换档操作 - 它通过应力循环,其预期寿命相对于循环的严重程度降低。当对循环底座加载的单元进行循环时,必须分析循环的影响,并且需要修改PM和PDM程序以保持组件的预期寿命。循环影响不同程度的不同组件,需要开发适当的检查和维护计划。必须修改关键绩效指标(KPI)以监控在设备上执行的检查和维护的有效性。例如,维护基础违规(MBV)是骑自行车单位的重要KPI。同样,必须在规划和调度活动中获得更多关注,因为在预防性维护单位的可用性方面存在许多不确定性。应按一项时间执行PMS的范例,应更改为吞吐量或运营时间。本文审查了不同循环模式对单位的影响和严重程度,适应新模式的共同组件的脆弱性以及讨论 - 一般条款 - 在检查和维护实践中需要进行的所需更改。此外,该纸质评论了可用于监测这些程序的影响的各种KPI。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号