首页> 外文会议>ASME Power Conference >Changing Fossil Unit Startup Process Reduces Rotor Stresses
【24h】

Changing Fossil Unit Startup Process Reduces Rotor Stresses

机译:改变化石装置启动过程可减少转子应力

获取原文

摘要

The changes in the energy market dispatching and pricing, have increased the need to start fossil steam turbines faster to meet demand and save fuel. Exelon worked with a consultant to optimize the start up times of their steam turbines resulting in greatly reduced start up times, increased dispatching frequency, and reduced thermal stresses on the turbines. This optimized start up process was achieved by utilization of the Valve Open Start (VOS)[1] and Accelerated Hot Start (AHS) process. VOS utilizes condenser vacuum aligned to the steam generator to produce superheated steam at much lower temperatures and pressures than usual. This steam is drawn through the turbine to warm the unit while the boiler increases in temperature and pressure. The AHS changes the startup sequence of operations by setting up the turbine in a manner that allows the turbine to roll at precisely the time that a perfect temperature match is obtained between the main steam temperature and first stage metal temperature. The use of these processes significantly increases profitability of the units and meets all OEM criteria for unit protection and results in a reduction in rotor thermal gradient, temperature mismatch, and thermally induced vibration.
机译:能源市场调度和定价的变化增加了开始更快地开始化石汽轮机以满足需求和节省燃料。 Exelon与顾问合作,优化其蒸汽轮机的启动时间,从而大大减少了最大减少的启动时间,增加了调度频率和涡轮机上的热应力。通过利用阀门打开开始(VOS)[1]并加速热启动(AHS)过程来实现该优化的启动过程。 VOS利用与蒸汽发生器对齐的冷凝器真空,在比往常的温度和压力下更低的温度和压力产生过热蒸汽。通过涡轮机绘制该蒸汽以温度温度温度和压力增加。 AHS通过以允许涡轮机允许的方式设置涡轮机以精确地滚动的方式来改变操作序列,精确地在主蒸汽温度和第一级金属温度之间获得完美的温度匹配的时间。这些过程的使用显着提高了单位的盈利能力,并满足了单位保护的所有OEM标准,并导致转子热梯度,温度不匹配和热诱导的振动减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号