首页> 外文会议>International Conference on Sustainable Infrastructure >Nelson Mandela Bay Metropolitan Municipality's Bus Rapid Transit System: Case Study
【24h】

Nelson Mandela Bay Metropolitan Municipality's Bus Rapid Transit System: Case Study

机译:纳尔逊·曼德拉湾都会区的公交系统:案例研究

获取原文

摘要

Hosting a mega-event such as the FIFA World Cup and Olympic Games is a potentially expensive matter. This paper presents the Nelson Mandela Bay Metropolitan Municipality's (NMBMM) bus rapid transit (BRT) system in Port Elizabeth, South Africa, as one of the key infrastructure projects for the 2010 FIFA World Cup. The BRT system was intended to perform as a two-phase project following a design-bid-build approach with the aim of providing additional public transportation to tourists visiting Port Elizabeth for the 2010 FIFA World Cup. However, this project has still yet to be completed due to a series of challenges compounded by poor planning and lack of oversight. This paper discusses the issues that have plagued the project's success, compares it with Germany's successful transportation improvements during the 2006 FIFA World Cup, and offers recommendations towards how the NMBMM could have prevented Port Elizabeth's BRT system issues from occurring. The results of our comparison suggest that while there can be considerable potential benefits for the host of a mega-event, many of them would not be realized or maximized due to organizational inadequacies and lack of proper management and long-term planning.
机译:举办诸如FIFA世界杯和奥运会之类的大型活动可能是一件昂贵的事情。本文介绍了位于南非伊丽莎白港的纳尔逊·曼德拉湾大都会区(NMBMM)公交快速运输(BRT)系统,将其作为2010年FIFA世界杯的关键基础设施项目之一。 BRT系统旨在按照设计-投标-建造方法作为一个分为两个阶段的项目执行,目的是为前往伊丽莎白港参加2010年FIFA世界杯的游客提供额外的公共交通。但是,由于规划不善和缺乏监督,使一系列挑战更加复杂,该项目尚未完成。本文讨论了困扰该项目成功的问题,并将其与德国在2006年FIFA世界杯期间成功改善交通运输相提并论,并就NMBMM如何防止伊丽莎白港的BRT系统问题的发生提供了建议。我们的比较结果表明,尽管举办大型活动可能会带来可观的潜在收益,但是由于组织上的不足,缺乏适当的管理和长期规划,许多大型事件无法实现或最大化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号