首页> 外文会议>World environmental and water resources congress >A Canal Capacity Evaluation Program for the South Florida Water Management District
【24h】

A Canal Capacity Evaluation Program for the South Florida Water Management District

机译:南佛罗里达州水管理区的运河能力评估计划

获取原文

摘要

The South Florida Water Management District (SFWMD) operates and maintains a regional water management system that consists of levees, reservoirs, and approximately 2,000 miles of canals along with their water control structures. Many of these canals and hydraulic structures were designed and constructed over 50 years ago by the U.S. Army Corps of Engineers as part of the Central and Southern Florida (C&SF) Project. Over time, the system has been deteriorating and, consequently, some canal reaches are unable to convey current design or regulatory discharges with an acceptable amount of freeboard. In some cases, a canal reach may not even be able to convey its original design discharges due to siltation or other conveyance restrictions. In order to understand the current state of the C&SF canals in regard to both original and current design requirements, the SFWMD has embarked on a new canal conveyance evaluation program (CCEP) in which canal capacities will be evaluated in regard to their original design flows, current design, or regulatory requirements, design water surface profiles, and available freeboard. For each C&SF canal, the intent of the CCEP is to use hydraulic models to assess the current conveyance capacity of the canal, evaluate the potential loss of its conveyance capacity relative to its design criteria, and in some cases develop cost-effective capacity improvement strategies. An application of the CCEP to the C-1W canal in southern Miami-Dade County, Florida, is presented as a case study.
机译:南佛罗里达州水管理区(SFWMD)运行和维护一个区域水管理系统,该系统由大堤,水库和大约2,000英里的运河及其水控制结构组成。作为中南部佛罗里达(C&SF)项目的一部分,其中许多运河和水力结构是50多年前由美国陆军工程兵团设计和建造的。随着时间的流逝,该系统一直在恶化,因此,某些运河段无法以可接受的干舷量来传达当前的设计或规则排水量。在某些情况下,由于淤积或其他运输限制,运河段甚至可能无法运输其原始设计排水量。为了了解C&SF运河在原始设计要求和当前设计要求方面的现状,SFWMD开始了一项新的运河运输评估程序(CCEP),其中将根据其原始设计流程评估运河的通行能力,当前的设计或法规要求,设计水面轮廓以及可用的干舷。对于每条C&SF运河,CCEP的目的是使用水力模型评估运河的当前输送能力,相对于其设计标准评估其输送能力的潜在损失,并在某些情况下制定具有成本效益的能力改进策略。作为案例研究,介绍了CCEP在佛罗里达州迈阿密-戴德县南部的C-1W运河中的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号