Pre-Excavation Grouting at the Hemphill Site-Atlanta WSP Tunnel, Atlanta, Georgia

机译:乔治亚州亚特兰大市Hemphill站点-Atlanta WSP隧道的开挖前注浆

获取原文

摘要

The City of Atlanta's Water Supply Program Tunnel Project, comprises a 24,000-ft long, 13-ft diameter, hard rock tunnel. A complex aspect of the project involves connecting five blind bore shafts to the tunnel in a location close to current drinking water reservoirs. During the supplemental geotechnical investigation following initial contract award, results from additional borehole geophysics were reviewed. Unfavorably oriented fracture sets forced a change in the original pre-excavation grouting program designed for that site. Real-time grout monitoring and geophysical data were compared to provide assurance that the program as designed correlates with the in-situ ground conditions. Following grouting, results were modeled, and all grouting data was reviewed to determine if grouting was complete.
机译:亚特兰大市的供水计划隧道项目包括一条24,000英尺长,直径13英尺的硬岩隧道。该项目的复杂方面涉及将五个盲孔井筒连接到靠近当前饮用水水库的位置的隧道。在获得初始合同之后的补充岩土工程勘察中,对来自其他钻孔地球物理学的结果进行了审查。不利的定向裂缝设置迫使为该部位设计的原始开挖前注浆程序发生了变化。对实时灌浆监测和地球物理数据进行了比较,以确保所设计的程序与现场地面条件相关。灌浆后,对结果进行建模,并检查所有灌浆数据以确定灌浆是否完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号