首页> 外文会议>IABSE conference on engineering the developing world >Construction of 90m multi-span viaducts with span by span construction method - a new possibility in bridge engineering
【24h】

Construction of 90m multi-span viaducts with span by span construction method - a new possibility in bridge engineering

机译:用跨度法施工跨度为90m的多跨高架桥-桥梁工程的新可能性

获取原文

摘要

This paper describes the background of the long-term R&D project which brought out the first application of a Large Movable Scaffolding System (LMSS) for the construction of a multi-span viaduct with successive spans ranging up to 90m long in Ankara region, Turkey. This is the first LMSS for multi-spans above 78 m spans ever applied worldwide. After mentioning the historical background and precedent state of art, this paper presents the main identified technical challenges and how they were overcome. The first application is briefly described, allowing defining its impact on present state of art. Finally, conclusions are drawn where it is verified that there are now more possibilities to erect multi-span viaducts, including with span-by-span in situ construction, which represent very significant reduction on materials consumption when compared with other construction methods.
机译:本文介绍了长期研发项目的背景,该项目首次提出了大型可移动脚手架系统(LMSS)在土耳其安卡拉地区建造跨距高达90m的跨跨高架桥的应用。这是世界上第一个针对跨度超过78 m的跨度的LMSS。在提及历史背景和先例技术之后,本文介绍了主要确定的技术挑战以及如何克服这些挑战。简要描述了第一个应用程序,可以定义其对当前技术水平的影响。最后,得出结论,可以证明现在有更多的可能性来竖立多跨高架桥,包括跨跨原位施工,与其他施工方法相比,这意味着材料消耗量大大减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号