FORT WAYNE TUNNEL WORKS - SUCCESSES AND LESSONS LEARNED IN BIDDING THE LARGEST SINGLE PROJECT IN CITY HISTORY

机译:韦恩堡隧道工程-竞标历史上最大的单个项目的经验教训

获取原文

摘要

The $200 million Three Rivers Protection and Overflow Reduction Tunnel (3RP0R.T) is the primary element in the City of Fort Wayne's Consent Decree program known as Fort Wayne Tunnel Works. 3RPORT is the largest project undertaken in city history'. The 3RPORT project was successfully bid and awarded in 2017 and employed key strategies to complete the design and bid the project during a window between other major tunnel projects in the USA. Key strategies included early engagement, favorable bidding of contractors through information sharing, outreach, and one-on-one discussions. Other strategies included prequalification, accelerated design, closely monitoring tunnel construction activity, project lifecycle risk management: and actively coordinating design, program management, legal and specialty consultant teams.
机译:耗资2亿美元的三河保护和减少溢流隧道(3RP0R.T)是韦恩堡市同意令计划中的主要内容,该计划被称为韦恩堡隧道工程。 3RPORT是城市历史上进行的最大项目”。 3RPORT项目在2017年成功中标并获得奖项,并采用关键策略完成设计并在美国其他主要隧道项目之间进行窗口招标期间对该项目进行投标。关键战略包括及早参与,通过信息共享,外展和一对一讨论来对承包商进行有利的投标。其他策略包括资格预审,加速设计,密切监视隧道建设活动,项目生命周期风险管理:以及积极协调设计,计划管理,法律和专业顾问团队。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号