ABSTRACT The Port of Los Angeles (POLA) recently completed the $72 million Berths 142-147 ICTF project as part of the 135 acre TraPac Terminal redevelopment. This state-of-the-art automated container terminal has a projected annual throughput capacity of 2.4 million 20-foot equivalent units (TEUs), 600,000 of which will move through the ICTF. The semi-automated on-dock intermodal yard (IY) is a key feature of this major redevelopment, with eight working tracks averaging 2,600 feet in length (30,000 track-ft overall) and wide-span rail mounted gantry (RMG) cranes. The on-dock IY has many automation enabling elements including: Optical character recognition (OCR) and Automatic Equipment Identification (AEI) technology; remotely controlled switches; advanced red flag/blue flag safety systems; Train-in-motion system; automated container handling technology; and full in-ground train brake airing system, making it one of the most technologically advanced on-dock rail facilities in the United States. This paper will focus on the key infrastructure enabling automation, intermodal yard characteristics, operations, and equipment. We will discuss: 1. Facility overview, including layout, track spacing, cross section, crane span, fencing, and safety systems; 2. Rail access, including interim operational restrictions due to at-grade crossings and planned remedies; 3. IY operations and equipment, including: details about the automated IY buffer management; coning and railcar repair crew equipment and protocols; remotely controlled wide-span RMG cranes; and other key infrastructure that enables increased productivity; 4. Lessons learned, including: onsite crane erection; early 3rd party vendor integration; and pavement. The paper will conclude with takeaways for planning and implementing the next generation of intermodal yards.
机译:摘要作为135英亩TraPac码头改建工程的一部分,洛杉矶港(POLA)最近完成了7200万美元的泊位142-147 ICTF项目。这个先进的自动化集装箱码头的预计年吞吐能力为240万个20英尺当量单位(TEU),其中600,000个将通过ICTF运送。半自动化的码头联运货场(IY)是这一重大重建项目的关键特征,它有8条平均长度为2600英尺(总轨道30,000英尺)的工作轨道和宽跨度的龙门起重机(RMG)。坞站IY具有许多自动化使能元素,包括:光学字符识别(OCR)和自动设备识别(AEI)技术;以及遥控开关;先进的红旗/蓝旗安全系统;运动训练系统;自动化的集装箱处理技术;以及完整的地下火车制动通风系统,使其成为美国技术最先进的码头铁路设施之一。本文将重点关注实现自动化,联运场特征,运营和设备的关键基础架构。我们将讨论:1.设施概述,包括布局,轨道间距,横截面,起重机跨度,围墙和安全系统; 2.铁路通行,包括由于平交道口和计划的补救措施而造成的临时运营限制; 3. IY操作和设备,包括:有关自动IY缓冲区管理的详细信息;圆锥和有轨电车维修人员的设备和规程;远程控制的大跨度RMG起重机;以及其他能够提高生产力的关键基础架构; 4.汲取的经验教训包括:现场起重机安装;早期的第三方供应商集成;和路面。本文将以规划和实施下一代多式联运堆场的重点总结。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号