Discovery and Remediation of Deteriorating Timber Trestles within an Embankment

机译:在路堤中不断恶化的木材栈道的发现和修复

获取原文

摘要

In October 2010, depressions on the downstream side of the left embankment at the Big Falls Hydroelectric Project were observed that led to the initiation of a Watch Condition of the Emergency Action Plan (EAP). The Federal Energy Regulatory Commission and other stakeholders were notified and a reservoir drawdown was initiated. Following initiation of the EAP, several potential mechanisms for the depressions were hypothesized and evaluated. Potential failure modes, construction records, record drawings, historic photographs and rock/soil conditions were all reviewed. The review of historic photographs indicated that numerous wooden trestles were utilized to transport materials from the bank/shoreline to the project features during the dam's construction in 1922. Drilling investigations were conducted and a repair was completed at twenty-two depression locations; repair consisted of augering into the depressions to remove loose or objectionable material and placing more suitable material.
机译:2010年10月,在大瀑布水电项目的左路堤下游下游发现了凹陷,导致启动了《紧急行动计划》的监视条件。通知了联邦能源管理委员会和其他利益相关者,并启动了水库缩编。在EAP启动后,对抑郁症的几种潜在机制进行了假设和评估。审查了潜在的破坏模式,施工记录,记录图,历史照片和岩石/土壤状况。对历史照片的回顾表明,在1922年大坝建设期间,使用了许多木制栈桥将材料从河岸/海岸线运输到项目特征。修理包括在凹坑中凿孔以去除松散或令人反感的材料,然后放置更合适的材料。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号