首页> 外文会议>Pipelines conference >Combined Interceptor Rehabilitation—Large-Diameter Sewer Presents Large Obstacles and Great Opportunity for North Charleston Sewer District
【24h】

Combined Interceptor Rehabilitation—Large-Diameter Sewer Presents Large Obstacles and Great Opportunity for North Charleston Sewer District

机译:拦截机的综合修复-大直径下水道给北查尔斯顿下水道区带来了很大的障碍和巨大的机会

获取原文

摘要

The success of the project, despite the difficult aspects of the site and the work completed can be attributed to the spirit of teamwork demonstrably applied during every stage of the project. The teamwork began with the relationship between the NCSD (Owner) and WK Dickson (Engineering Consultant), who have undertaken numerous challenging projects involving their collection system over the past several years. These projects require early planning, an intimate familiarity with the route of the host pipe and alternative for the bypass in the design and construction. Adjustments and field revisions on the fly are the norm, rather than the exception. The CIPP rehabilitation of other large diameter sections of the Cooper Interceptor served as training for the Combined Interceptor. The railway and roadway crossings were large obstacles, but not unique nor new to the design team. The initial planning by engineers from the NCSD and WK Dickson along with the feasibility analysis by Jacobs Engineering Group's (Sub Consultant) sewer rehabilitation specialist, Stephen Lindsey, gave the confidence that the project would be successful. Mr. Lindsey also performed resident project representation services, interacting, coordinating and observing operations by the Contractor throughout the rehabilitation construction phase. The affected property owners and regulatory agencies bought in and assisted as they could to facilitate finalization of the plans, permits, and regulatory agreements to allow the project to get underway. Lastly, the contractor joined the project with a cooperative, team-oriented approach and proceeded to construct the project in an efficient and professional manner. SAK demonstrated their desire to accept the challenges and execute the project. The contractor with their subcontractors and the other participants and stakeholders pulled together with cooperative efforts to complete this rather large and complex project.
机译:尽管站点的各个方面困难重重,并且已完成工作,但该项目的成功还是可以归因于团队精神,该精神在项目的每个阶段都得到了证明。团队合作始于NCSD(所有者)和WK Dickson(工程顾问)之间的关系,在过去的几年中,他们已经完成了涉及其收集系统的众多挑战性项目。这些项目需要及早进行规划,对主管管道的路线非常熟悉,并在设计和施工中替代旁路。调整和现场修订是正常的,而不是例外。库珀拦截器的其他大口径部分的CIPP修复是联合拦截器的培训。铁路和人行横道是很大的障碍,但对于设计团队而言并不是唯一的,也不是新的。 NCSD和WK Dickson工程师的初步计划以及Jacobs Engineering Group(副顾问)下水道修复专家Stephen Lindsey进行的可行性分析,使该项目获得了成功的信心。 Lindsey先生还执行了居民项目代表服务,在整个恢复建设阶段中,承包商进行了互动,协调和观察操作。受影响的财产所有人和监管机构尽可能地购买并提供帮助,以帮助最终确定计划,许可证和监管协议,以使该项目得以进行。最后,承包商以合作,面向团队的方式加入该项目,并以高效,专业的方式着手建设该项目。 SAK表现出了接受挑战并执行项目的愿望。承包商及其分包商,其他参与者和利益相关者齐心协力,共同完成了这个相当大而复杂的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号