首页> 外文会议>Pipelines conference >Alternative Delivery Methods in the Water and Wastewater Industry: Challenges and Opportunities
【24h】

Alternative Delivery Methods in the Water and Wastewater Industry: Challenges and Opportunities

机译:水和废水工业中的替代性输送方法:挑战与机遇

获取原文

摘要

Today, there is an urgent need to upgrade existing drinking water and wastewater treatment facilities and build new ones. Aging infrastructure, population growth, and more stringent environmental regulations have been some of the main drivers. Water industry leaders and decision-makers are looking at innovative technological and project delivery solutions to help ease their financial burden. Water and wastewater treatment plants have traditionally been constructed, retrofitted, and rehabilitated using the design-bid-build (DBB) project delivery. DBB has been used for decades and is adequate for projects where the work is well defined and there is relatively low uncertainty (i.e., projects that are repetitive, with low complexity). However, DBB might not be the best method to use for more complex facilities where integration between the different stakeholders can result in more innovation and improve efficiencies. Several organizations have promoted the use of non-traditional, alternative project delivery methods (APDM) such as design-build (DB) and construction manager at risk (CMAR) touting benefits including lower cost, faster schedules, and higher quality. These alternative methods have been used in the transportation and building sectors, and are starting to be adopted in the water utility sector. This paper overviews published sources that have quantified the impact of delivery systems on project performance in several industries. This overview will be the foundation for a discussion of challenges and opportunities of adopting alternative delivery methods in the water and wastewater industry.
机译:今天,迫切需要升级现有的饮用水和废水处理设施,并建造新的饮用水。老化基础设施,人口增长和更严格的环境法规是一些主要司机。水产业领导者和决策者正在寻找创新的技术和项目交付解决方案,以帮助缓解金融负担。传统上,使用设计 - 出价(DBB)项目交付来构建,改造和恢复水和废水处理厂。 DBB已经使用了几十年,适用于工作所定义的工作,并且不确定性相对较低(即重复的项目,具有低复杂性)。但是,DBB可能不是用于更复杂的设施的最佳方法,在不同利益相关者之间集成可能导致更多的创新和提高效率。若干组织促进了非传统,替代项目交付方法(APDM),如设计 - 构建(DB)和施工经理(CMAR)吹捧福利,包括较低的成本,更快的时间表和更高质量。这些替代方法已用于运输和建筑物部门,并开始在水实用部门中采用。本文概述了已发布的来源,这些消息来源量化了交付系统对几个行业项目绩效的影响。这一概述将是讨论采用水和废水行业中采用替代交付方法的挑战和机遇的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号