首页> 外文会议>ASCE international workshop on computing in civil engineering >Long Term Change Pattern Analysis of Bidding Price Based on Non-Parametric Framework
【24h】

Long Term Change Pattern Analysis of Bidding Price Based on Non-Parametric Framework

机译:基于非参数框架的投标价格长期变化模式分析

获取原文

摘要

Resurfacing is one of the most common highway projects in Georgia with large investment every year. The unit bidding price, proposed by contractors to fulfill the project, is one of a leading indicators to reflect the cost of department of transportation (DOT) in resurfacing projects. Compared to other cost index researches, the changing trend and big volatility of unit bidding price make the analysis more difficult, and thus the Pearson and Spearman correlation test turned out to be inapplicable here to find the relation of unit bidding price to other indicators. To fill this gap while focusing on the long term trend change, the research proposed a non-parametric analysis framework, which could first find the changing trend of unit bidding price in different segments and then find the relation of trend pattern among unit bidding price and other selected indicators. The results show that the national highway construction cost index (NHCCI) could be a useful indicator to reflect the trend change of unit bidding price.
机译:重铺路面是佐治亚州最常见的高速公路项目之一,每年都有大量投资。承包商为完成该项目而提出的单位投标价格,是反映运输部门在铺装项目中的成本的主要指标之一。与其他成本指标研究相比,单位投标价格的变化趋势和较大的波动使分析变得更加困难,因此,Pearson和Spearman相关检验在这里不适用于寻找单位投标价格与其他指标的关系。为了填补这一空白,同时着眼于长期趋势变化,该研究提出了一种非参数分析框架,该框架可以首先找到不同细分市场中单位投标价格的变化趋势,然后找到趋势图在单位投标价格和价格之间的关系。其他选定的指标。结果表明,全国公路建设成本指数(NHCCI)可以作为反映单位投标价格趋势变化的有用指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号