首页> 外文会议>World environmental and water resources congress >William Mulholland: Father of the Los Angeles Municipal Water Supply System
【24h】

William Mulholland: Father of the Los Angeles Municipal Water Supply System

机译:威廉·穆赫兰德(William Mulholland):洛杉矶市政供水系统之父

获取原文

摘要

William "Bill" Mulholland (1855-1935) a self-taught civil engineer, who at the zenith of his career was the highest paid public official in California and the most respected man in Los Angeles in 1926. His storied career came to an abrupt end with the catastrophic failure of the St. Francis Dam in March 1928. A native of Belfast, Mulholland took to the seas at age 15, and in 1878 took a job as a ditch tender for the Los Angeles Water Company. He rose through the ranks to supervise the drilling of wells and constructing a system of distribution. When the water company was absorbed by the City in 1902, Mulholland hired as the general manager of a metered municipal water system. He possessed a willingness to work in the field under difficult conditions and was a natural leader and problem solver, who brought all of his projects in on time and on budget. For Bill Mulholland and the hundreds of civil engineers whom he influenced, their challenge was that of harnessing nature to build a better world, providing the water that was essential to the growth of southern California. His crowning achievement was the First Los Angeles Aqueduct, constructed in 1906-13. With a gravity fall of 3,260 feet and a length of 233 miles, no one imagined that its delivery capacity would be found insufficient less than a decade after its completion.
机译:威廉·“比尔”·穆赫兰(William“ Bill” Mulholland(1855-1935)是一位自学成才的土木工程师,在其职业生涯的顶峰时期,他是加利福尼亚州薪酬最高的公职人员,也是1926年在洛杉矶最受人尊敬的人。 1928年3月,圣弗朗西斯大坝的灾难性破坏结束了。穆赫兰(Mulholland)是贝尔法斯特人,15岁时就出海了,1878年,他担任了洛杉矶自来水公司的沟渠招标工作。他晋升为督导井的钻探并建立分销系统的负责人。当自来水公司在1902年被市政府吸收后,穆赫兰(Mulholland)被聘为市政计量水系统的总经理。他愿意在困难的条件下在现场工作,并且是天生的领导者和解决问题的人,他按时按预算完成了所有项目。对于比尔·穆赫兰德(Bill Mulholland)和他所影响的数百名土木工程师来说,他们面临的挑战是利用自然来建设更美好的世界,提供对南加州的成长至关重要的水。他的最高成就是1906-13年建造的第一条洛杉矶渡槽。由于重力下降了3,260英尺,全长233英里,没有人能想象到它的交付能力在完成后不到十年就会发现不足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号