【24h】

Grey linear space based grey project scheduling

机译:基于灰色线性空间的灰色项目调度

获取原文

摘要

Based on the idea of grey theory, the uncertain duration with clear extension but unclear intension in project scheduling can be characterized as the grey number. However, the operations of the grey number borrowed from other uncertainty theory had long puzzled scholars. This paper address grey project scheduling based on grey linear space. The grey linear operation based on grey linear space and comparison method based on the information background were proposed. Then grey project scheduling problem was studied. And the critical path method under grey linear space was developed. Finally, a numerical case was adopted to test effectiveness of proposed method. Results show grey project scheduling and grey critical path method could be established under grey linear space.
机译:根据灰色理论的思想,可以将不确定的工期,明确的延期,但项目调度的意图不明确的特征称为灰色数。但是,从其他不确定性理论借来的灰数运算早已使学者感到困惑。本文研究了基于灰色线性空间的灰色项目调度。提出了基于灰色线性空间的灰色线性运算和基于信息背景的比较方法。然后研究了灰色项目调度问题。提出了灰色线性空间下的临界路径法。最后,通过数值算例验证了所提方法的有效性。结果表明,在灰色线性空间下可以建立灰色工程调度和灰色关键路径方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号