首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >Monitoring the Tappan Zee Bridge During Pile Installation for the Adjacent New NY Bridge
【24h】

Monitoring the Tappan Zee Bridge During Pile Installation for the Adjacent New NY Bridge

机译:在毗邻新纽约大桥的桩安装过程中监视Tappan Zee大桥

获取原文

摘要

High capacity driven piles are being used to support two new bridges that will replace the Tappan ZeeBridge over the Hudson River. Some new piles were driven within 20 feet of the bridge. A monitoring system wasrequired to evaluate the impacts of pile installation. The system was designed to use networked automated totalstations with GPS base stations to overcome the challenge of measuring deflections on the bridge without fixedreference points.
机译:高承载力桩被用于支撑两座新桥,这些桥将取代Tappan Zee 哈德逊河上的桥。在桥的20英尺范围内打入了一些新桩。一个监测系统是 需要评估桩安装的影响。该系统旨在使用联网的自动化总计 GPS基站的基站克服了在不固定的情况下测量桥梁挠度的挑战 参考点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号