首页> 外文会议>IEEE International Energy Conference >Harmonic modelling, propagation and mitigation for large wind power plants connected via long HVAC cables: Review and outlook of current research
【24h】

Harmonic modelling, propagation and mitigation for large wind power plants connected via long HVAC cables: Review and outlook of current research

机译:通过长HVAC电缆连接的大型风力发电厂的谐波建模,传播和缓解:当前研究的回顾和展望

获取原文

摘要

This paper presents a state-of-the-art review on grid connection of large offshore wind power plants (OWPPs) using extra-long high voltage AC (HVAC) cables. The paper describes research by DONG Energy Wind Power in close collaboration with Aalborg University addressing related challenges through an industrial PhD project. The overall goal is to gain a better understanding of extra-long HVAC cable connected OWPPs, in order to ensure reliability and availability of OWPPs. This will reduce the cost of energy, as the risk of costly delays and modifications after the project has been commissioned can be reduced and operational availability and the reliability can be improved. Challenges hereto include lower resonance frequencies due to the long cables, frequency dependent modelling of long submarine cables, passive filtering, and PLL dynamics in the control loops (from a harmonic stability point of view).
机译:本文介绍了使用超长高压交流(HVAC)电缆的大型海上风力发电厂(OWPP)的电网连接的最新技术综述。本文介绍了DONG Energy Wind Power与奥尔堡大学紧密合作通过一项工业博士项目解决相关挑战的研究。总体目标是更好地了解连接超长HVAC电缆的OWPP,以确保OWPP的可靠性和可用性。这将减少能源成本,因为可以减少项目调试后的高昂延误和修改风险,并可以提高运营可用性和可靠性。挑战包括长电缆引起的较低的谐振频率,长海底电缆的频率相关建模,无源滤波和控制回路中的PLL动态(从谐波稳定性的角度来看)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号