首页> 外文会议>International conference on construction and real estate management >Strategy of Bidding under the Engineering Bill Pricing Mode
【24h】

Strategy of Bidding under the Engineering Bill Pricing Mode

机译:工程单价模式下的投标策略

获取原文

摘要

Now the competition of construction market is becoming more and more fiercely and China adopted engineering quantity list valuation for the construction market traction. Our country lastly introduces the 2013 edition of "code of valuation with bill quantity of Construction Engineering"(GB50500-2013) as the basis of list valuation. The owner issues tenders and the construction unit bidding for the project. This article aims to study how to choice fitful engineering by the construction unit and how to bidding effectively to increase the rate of win the bid maximally in the range of qualifications, then enterprises can made healthy and orderly progress.
机译:现在建筑市场的竞争越来越激烈,中国采用工程量清单计价法来吸引建筑市场。最后,我国以2013年版的《建筑工程造价计价规范》(GB50500-2013)为清单计价依据。业主为该项目进行招标,施工单位进行招标。本文旨在研究建设单位如何选择合适的工程,如何有效地进行招标,以在资格范围内最大限度地提高中标率,使企业健康有序地发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号