Understanding Construction Projects' Schedule Overruns in South Africa

机译:了解南非的建设项目进度超支

获取原文

摘要

Construction schedule overruns are not uncommon on construction projects world over and the South African construction industry has not escaped the challenges of failing to deliver projects on time. In order to find mitigation measures of schedule overruns, the first step is to identify the causes of these overruns. Therefore, this paper assesses the causes of construction projects schedule overruns in the South African construction industry, a case of the Gauteng Province. The data used in this paper were derived from both primary and secondary sources. The secondary data was collected via a detailed review of related literature. The primary data was collected through a structured questionnaire which was distributed to construction professionals, who include: Architects, quantity surveyors, civil engineers, construction mangers and project managers. Data received from the questionnaires was analyzed using descriptive statistics procedures. Findings from the study revealed that slowness in decision making process, reworks due to errors during construction, delay in approving major changes in the scope of work, delay in material delivery, shortage of skilled equipment operators, low productivity level of workers, delay in obtaining permits from municipalities and workers risky behavior on sites were the major causes of construction projects schedule overruns in Gauteng, South Africa. The study contributes to the body of knowledge on the subject of the causes of construction project schedule overruns in Gauteng, South Africa.
机译:在世界各地的建筑项目中,进度超支并不罕见,南非建筑业也未能避免未能按时交付项目的挑战。为了找到缓解计划超支的措施,第一步是确定造成这些超支的原因。因此,本文以南非豪登省为例,评估了南非建筑业中建设项目进度超支的原因。本文使用的数据均来自主要和次要来源。二级数据是通过对相关文献的详细回顾而收集的。原始数据是通过结构化问卷收集的,该问卷已分发给建筑专业人员,其中包括:建筑师,工料测量师,土木工程师,建筑经理和项目经理。使用描述性统计程序分析了从问卷中获得的数据。研究发现,决策过程缓慢,由于施工过程中的错误而导致的返工,工作范围重大变更的批准延迟,材料交付的延迟,熟练设备操作员的短缺,工人的生产率低下,获取的延迟市政当局的许可证和工地上的危险行为是南非豪登省建设项目进度超支的主要原因。该研究有助于了解南非豪登省建设项目进度超支的原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号