首页> 外文会议>International conference on marine design >SHIP BLOCK DIVISION PLANNING METHODOLOGY CONSIDERING UNCERTAINTIES AT EARLY DESIGN STAGES
【24h】

SHIP BLOCK DIVISION PLANNING METHODOLOGY CONSIDERING UNCERTAINTIES AT EARLY DESIGN STAGES

机译:在早期设计阶段考虑不确定性的船舶区划规划方法

获取原文

摘要

Block or module division planning is an important stage in the manufacturing design of ship hull structure and similar steel structures. During module division planning various factors such as crane capacities, hull structural arrangements, outfitting arrangements, material availability etc., must be considered simultaneously. At an early design stage, detailed information on these factors or constraints might not be certain. This uncertainty makes the generation of optimum module division planning difficult. In this paper, a module division planning methodology is proposed for the management of these uncertainties in the information at an early design stage. Using the system various module division plans can be generated, evaluated and ranked considering various factors affecting module division planning and their uncertainties. Based on the evaluation, some of the 'preferable' module division plans can be selected. The system is based on graph theory and fuzzy logic.
机译:块或模块的划分计划是船体结构和类似钢结构制造设计中的重要阶段。在模块划分计划中,必须同时考虑各种因素,例如起重机的容量,船体的结构布置,outfit装布置,材料可用性等。在设计的早期阶段,可能无法确定有关这些因素或约束的详细信息。这种不确定性使生成最佳模块划分计划变得困难。在本文中,提出了一种模块划分计划方法,用于在设计的早期阶段管理信息中的这些不确定性。使用该系统,可以考虑影响模块划分计划的各种因素及其不确定性来生成,评估和排列各种模块划分计划。基于评估,可以选择一些“最佳”模块划分计划。该系统基于图论和模糊逻辑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号