首页> 外文会议>Construction research congress >Risk Management for Build-Transfer plus Land Usage Fee Reimbursement Delivery Method in China
【24h】

Risk Management for Build-Transfer plus Land Usage Fee Reimbursement Delivery Method in China

机译:中国建筑转让与土地使用费偿还交付方式的风险管理

获取原文

摘要

To meet the large demands for infrastructure and public facilities in the rapid urbanization process, the Chinese government has issued a series of regulations for promoting private investments and participations. Among different applications of private investment, build-transfer (BT) method was widely explored for not-for-profit infrastructure and public facilities. First, private investors finance and build infrastructure and public facilities, indirectly promoting urban area and house market development. Later, the government gets land usage fees (LUF) from real estate developers and pays the private investor back using LUF. This BT plus LUF delivery method is an innovative way to solve the dilemma between "development" and "fund shortage" in China. However, the risks such as long construction period, high investment, and obstacles in land acquisition make it difficult to implement. This paper attempts to illustrate the mechanism and risk management of this delivery method. An ecological small town located in central China was used as a case study. Based on literature review and characteristics analysis of the case, a list of initial risk factors was proposed. A questionnaire survey was then conducted, based on that, 28 risk factors were allocated between the government and the private investor, and ranked according to their significance scores. Furthermore, control measurements for the top four government-responsible risk factors were discussed. The results create a systematic risk management framework including risk identification, risk evaluation, and risk response, which can provide a reference for risk management of foreign or domestic investors in China.
机译:为了满足快速城市化进程中对基础设施和公共设施的巨大需求,中国政府发布了一系列促进私人投资和参与的法规。在私人投资的不同应用中,人们广泛探索了非营利性基础设施和公共设施的建造-转让(BT)方法。首先,私人投资者融资并建设基础设施和公共设施,间接地促进了市区和房屋市场的发展。后来,政府从房地产开发商处收取土地使用费(LUF),并使用LUF偿还私人投资者。这种BT加LUF交付方式是解决中国“发展”与“资金短缺”困境的一种创新方式。但是,由于建设周期长,投资高,征地障碍等风险,难以实施。本文试图说明这种交付方法的机制和风险管理。以中国中部的一个生态小镇为例。在对文献进行回顾和特征分析的基础上,提出了一系列初始危险因素。然后进行了问卷调查,在此基础上,政府和私人投资者之间分配了28个风险因素,并根据它们的显着性得分进行了排名。此外,还讨论了由政府负责的前四个风险因素的控制措施。研究结果建立了一个系统的风险管理框架,包括风险识别,风险评估和风险应对,可以为中国境内外国投资者的风险管理提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号