首页> 外文会议>International Conference on Live Maintenance >Replacement of existing ground wire with OPGW under live-line conditions new training polygon in Olsztyn
【24h】

Replacement of existing ground wire with OPGW under live-line conditions new training polygon in Olsztyn

机译:在带电条件下用OPGW替换现有的地线,在奥尔什丁建立新的训练多边形

获取原文

摘要

Replacement of existing ground wires with OPGW under live-line conditions. This paper describes methods and examples of building fibre optics tract by different existing and actual methods on energized transmission line abroad and in Poland. In addition, an analysis of electromagnetic field induction from existing and nearby energized line when OPGW is being installed is presented. The paper also presents a newly built training polygon in Olsztyn for secure operation practice.
机译:在带电情况下用OPGW替换现有的地线。本文介绍了在国外和波兰的通电传输线上采用不同的现有方法和实际方法来构建光纤通道的方法和示例。此外,还介绍了在安装OPGW时从现有的和附近的通电线路产生的电磁场感应的分析结果。本文还介绍了在奥尔什丁新建的训练多边形,用于安全操作实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号