Live rehabilitation of 400kV OHL Mintia-Sibiu

机译:400kV OHL Mintia-Sibiu的现场康复

获取原文

摘要

The 400kV Mintia-Sibiu OHL was build in 1971–1972. In 2011-2013 National Transmission Company (CN Transelectrica SA) performed a refurbishment project for the OHL elements. A part of this large project is executed in LW technology by the maintenance subsidiary of Transelectrica (SC Smart SA). The live working part of project consist of: replacement of suspension insulation strings, replacement of insulation chain elements, replacement of dampers, replacement of vibration dampers, Installation of armour-rods together with suspension clamps, painting, Installation of aerial plates on towers, replacement of damaged tower elements. The work was done using some new methods for access on the conductors, including the aerial insulating platform class A. When a project starts we should consider all the ways to complete the works. Considering present technologies used in Romania some works needs deenergization of the line. For other parts of the project Live Working is mandatory, in order to maintain the system's stability. At the end of the project an economical analysis is done. Was it efficient to use Live Maintenance technologies?
机译:400kv Mintia-Sibiu Ohl于1971年至1972年建成。 2011 - 2013年 - 2013年国家传输公司(CN Transeelectra)为OHL元素进行了翻新项目。该大型项目的一部分由TransEleTeric(SC Smart SA)的维护子公司在LW技术中执行。项目的现场工作部件包括:更换悬挂保温串,更换绝缘链元件,更换阻尼器,振动阻尼器的更换,悬挂夹具,绘画,塔上的空气板安装,更换损坏的塔元素。这项工作是使用一些新方法进行的,用于在导体上访问,包括空中绝缘平台A类。当项目开始时,我们应该考虑所有完成工作的方法。考虑到罗马尼亚使用的目前技术,一些作品需要对线的切片化。对于项目的其他部分实时工作是强制性的,为了保持系统的稳定性。在该项目结束时,完成了经济分析。使用实时维护技术是否有效?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号