首页> 外文会议>International Conference on Live Maintenance >Complete solutions for LW maintenance of high voltage OHL
【24h】

Complete solutions for LW maintenance of high voltage OHL

机译:高压OHL LW维护的完整解决方案

获取原文

摘要

The Live Working techniques on overhead lines are already a common place in Romanian Transmission Grid. From 1979 a lot of maintenance works where done in Live technologies. From insulators replacement to complex reparation works where done on 400 and 220kV OHL. New technologies where developed in the last period, such as replacement of anchors, mounting of monitoring systems, mounting of line arresters, replacement of ground wire, etc. From this to overlaying almost all maintenance works needed on maintenance projects of OHL's it is a small step. The paper presents actual and possible works in Live technologies for refurbishing OHLs. From common practices to modern new technologies (including robots) all Live methods should be included in maintenance to avoid the deenergizing of the line. The new tools and technologies developed in the world are taken into consideration. Finally almost all maintenance works can be done without deenergizing the line.
机译:架空线上的实时工作技术已经在罗马尼亚输电网中普遍使用。从1979年开始,许多维护工作都在实时技术中完成。从绝缘子更换到复杂的修复工作,均在400和220kV OHL上完成。上一阶段开发的新技术,例如更换锚,安装监控系统,安装避雷器,更换地线等。从此到覆盖OHL维护项目所需的几乎所有维护工作,这都是很小的事情步。本文介绍了用于翻新OHL的实时技术的实际和可能的工作。从常规做法到现代新技术(包括机器人),所有Live方法都应包括在维护中,以避免生产线断电。考虑了世界上开发的新工具和技术。最终,几乎所有维护工作都可以完成,而无需断电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号