Research on main transformer capacity configuration of 110~35kv substation based on different power regions

机译:基于不同电源区的110〜35kV变电站主变压器容量配置研究

获取原文

摘要

The grid characteristics significantly differ in various areas because of the broad region in China. The appropriate construction standards should b e researched according to the different supply regions. The main trans former capacity con figuration of 110~35kV substation is researched in the paper. The optimization method of main transformer capacity is proposed. The capacity optimization mathematical model is established which takes the lowest annual cost per unit area of power network as the objective function. And the corresponding grid models of different voltage levels are created. The main transformer capacities of 110~35kV substation are optimized according to the load characteristics of different supply regions and the final capacity configuration is proposed.
机译:由于中国广泛的地区,各个领域的网格特征在各个领域显着差异。适当的建筑标准根据不同的供应区,应该研究。本文研究了110〜35kV变电站的主反式以前容量。提出了主要变压器能力的优化方法。建立了容量优化数学模型,从电网每单位面积最低为目标函数。并且创建了不同电压电平的相应网格模型。 110〜35kV变电站的主变压器容量根据不同供电区的负载特性进行优化,提出了最终容量配置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号