Design and construction of a twin-box girder bridge over major interchange in Montreal

机译:蒙特利尔主要交汇处的双箱梁桥的设计与施工

获取原文

摘要

A major reconstruction project at the intersection of highways A15 and A40 in Montreal has been underway for almost two years. The project comprises - among other road and bridge works - a construction of an overpass connecting A40 East to A15 North over A40. The paper presents main structural features of the overpass and its construction. The new structure had to meet several constraints such as the interchange geometry, a requirement to minimize traffic disruptions during construction as well as the aesthetics of the structure which will be visible from all angles by drivers and passersby. A design comprising three-span horizontally curved steel box girders with a concrete deck was chosen for this structure. Span lengths of 44.4 m + 64.4 m + 44.4 m and a constant structural depth not exceeding 2.30m were selected to meet the design criteria. Two trapezoidal box girders curved in horizontal and vertical planes support two lanes of traffic and two shoulders (total width of 12.9m). The structure is designed as Lifeline Bridge and pot bearings with shear keys were necessary to meet both service and seismic loading conditions. Anchors to rock were also used on piers foundations. Fabrication of structural steel was done by Canam-Bridges, which delivered ten sections of the complete superstructure (total steel weight 458 tons). The final assembly was conducted in one night using ten mobile cranes and no temporary supports. The viaduct was opened to traffic in August 2012.
机译:蒙特利尔A15和A40高速公路交叉口的一项重大重建项目已经进行了将近两年。该项目包括(除其他道路和桥梁工程外)一座立交桥的建设,该立交桥将A40东与A40上的A15北连接起来。本文介绍了立交桥的主要结构特征及其构造。新结构必须满足一些限制条件,例如互换几何形状,在施工过程中尽量减少交通中断的要求以及驾驶员和过路人从各个角度都可以看到的结构美感。为此结构选择了一种设计,该设计包括三跨水平弯曲的钢制箱形梁和混凝土面板。为了满足设计标准,选择了44.4 m + 64.4 m + 44.4 m的跨度长度和不超过2.30m的恒定结构深度。在水平和垂直平面弯曲的两个梯形箱梁支撑两条行车线和两个路肩(总宽度为12.9m)。该结构设计为救生索桥,必须配备带剪切键的罐式轴承才能满足使用和地震荷载条件。锚固岩石也被用于码头基础上。结构钢的制造由Canam-Bridges完成,该结构交付了十个完整上部结构的截面(钢总重量458吨)。最后的组装是在一晚上使用十台移动式起重机进行的,没有临时支撑。高架桥于2012年8月开放通车。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号