首页> 外文会议>Conference on ISA automation week >Route 2H Implications on IEC 61511
【24h】

Route 2H Implications on IEC 61511

机译:IEC 61511的Route 2H含义

获取原文

摘要

1. New definition for "Safe Failures", made standard more precise and abuse resistant. 2. Route 2_H should not be "propagated" to new reviews of IEC 61511, as it will create confusion. PIU concept is sound enough. 3. Some users are moving steadily to a policy of supporting their field instrumentation selection based on solid field data, collected within their organization. These users are showing willingness to share experiences for the collective good in associations such as the Instrument Reliability Network (IRN) at Texas A&M (MKOPSC) or NAMUR 4. New philosophies are being discussed for new field instruments development for safety rated applications, with limited diagnostics but very well know failure modes (Type A or Simple Type B instruments with say, more than 60% automatic diagnostic coverage factor).
机译:1.对“安全失败”的新定义使标准更加精确和抗滥用。 2.路线2_H不应“传播”到IEC 61511的新审查中,因为它会引起混乱。 PIU的概念很合理。 3.一些用户正在稳步采用一种策略,以支持基于组织内部收集的实地数据来选择他们的现场仪表。这些用户显示出愿意与团体分享经验的意愿,例如得克萨斯A&M(MKOPSC)或NAMUR 4的仪器可靠性网络(IRN)。诊断,但众所周知的故障模式(自动诊断覆盖率超过60%的A型或B型简单仪器)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号