首页> 外文会议>Offshore Technology Conference >A Novel Hydrate Strategy in a High Risk Hydrate Environment for a Fast Track Tie-in GoM Development
【24h】

A Novel Hydrate Strategy in a High Risk Hydrate Environment for a Fast Track Tie-in GoM Development

机译:一种新的水合物策略在高风险水合物环境中进行快速轨道搭建的GOM开发

获取原文

摘要

Under the current market environment, deep water projects are required to evolve a more robust cost solution to remain competitive within the industry portfolio, ensuring safety as priority. With such market drivers in place, this paper details the engineering behind the development of a single flowline concept that ties-in to an existing production system for a GoM deep water development and the associated challenging flow assurance aspects of that design. The development is a fast track project (approximately 1.5 year from concept to first-oil) that leverages existing subsea infrastructure. The flowline length is over 10,000 ft at water depths exceeding 5,000 ft and will tie-in to a current flow loop dead leg of more than 7 miles in length. Success of the project will set a trend and allow development for future projects, i.e. infrastructure led solutions utilizing single flowlines with rapid delivery and increased financial returns.
机译:在目前的市场环境下,深水项目必须在行业组合中发展更加强大的成本解决方案,以确保安全优先。随着这些市场司机到位,本文详细介绍了一个流动线概念的开发后的工程,这些概念与现有生产系统联系在于GOM深水开发和该设计的相关具有挑战性的流量保证方面。该开发是一种快速轨道项目(从概念到第一油的大约1.5年),利用现有的海底基础设施。流动线长度超过5,000英尺的水深超过10,000英尺,并将粘合到电流的流回到长度超过7英里的止血。该项目的成功将制定趋势并允许未来项目的开发,即,基础设施LED解决方案利用单流程,运送快速交付和增加的财务回报。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号