首页> 外文会议>Offshore Technology Conference >Prelude FLNG Towing, Station-Keeping and Mooring Hook-Up
【24h】

Prelude FLNG Towing, Station-Keeping and Mooring Hook-Up

机译:Prelude Flg牵引,站保存和系泊联系

获取原文

摘要

Prelude FLNG ("Prelude"), the largest offshore floating facility ever built, was constructed in Geoje, South Korea, requiring a 3,200nm ocean tow to its installation location 475km north northeast of Broome, Western Australia. A team of station keeping vessels then took control of Prelude to accurately hold her in position above the pre-laid moorings for mooring hook-up operations.Planning and executing the tow, station keeping and mooring hook-up operations for mega floaters in remote locations requires precise planning, bespoke solutions to unprecedented challenges, comprehensive testing over a prolonged period and a global team with a diverse skill set. Overcoming key challenges required extensive engineering coupled with state-of-the-art vessel simulations, a bespoke mooring handling system, and full-scale winch wire testing. The result was a safe, successful and efficient operation demonstrating the industry's ability to execute the unprecedented challenges of projects in the search for economic development of remote and challenging reservoirs.
机译:PRELUDE FLNG(“PRELUDE”)是最大的海上浮动设施,曾在韩国地质府建造的,需要3200nm的海洋拖车到西澳大利亚布鲁姆东北部的安装位置475km。一支驻防船队保存船只随后控制了准确地将她的位置放在上面的前桅以上,用于停泊运营。驾驶和执行牵引,站,在远程位置的Mega Floaters的挂钩操作需要精确规划,定制解决方案,以前所未有的挑战,在长期期间和一个具有多元化的技能组织的全球团队进行全面测试。克服关键挑战需要广泛的工程与最先进的船舶模拟,定制系泊处理系统和全尺寸绞车线测试。结果是一种安全,成功,有效的运作,展示了行业在寻求遥远和挑战水库的经济发展中执行项目前所未有的项目挑战的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号