PLANNING, EXTENSIVE MONITORING AND GOOD COMMUNICATION SOLVES PUBLIC NOISE CONCERNS ON 2 LARGE HDD CROSSINGS IN SUNDRE, ALBERTA

机译:规划,广泛的监控和良好的通信解决了阿尔伯塔省桑德雷(Sundre)两处大型硬盘穿越中的公共噪音问题

获取原文

摘要

In 2010 the Town of Sundre, Alberta constructed two large diameter pipeline crossings of the RedDeer River using Horizontal Directional Drilling (HDD) technology. Each crossing was approximately 450 m inlength. The crossing pipelines; sanitary (406 mm OD) and potable water (560mm OD), were constructed from DR9HDPE and were installed to provide for new and existing development on the east side of the Red Deer River; as theTown currently provides water and wastewater services to the west side of town only. This would add 250 residentsand related businesses to the present population of 2,700. The Town of Sundre is located in a peaceful rural settingwith excellent golf courses, supporting infrastructure and a number of retirees. Noise from 24 hour drill rigoperations and 12 hour/day shift casing hammer operations, was anticipated to be a major obstacle for the projectdue to the proximity of the crossing location to the Town center (about 250 metres). In addition there was asignificant depth of sand and gravel on the entry side that required the installation of about 80 metres of largediameter casing. Installation of the casing was restricted to day shift only however drilling was undertaken as a 24hour operation to complete the crossing as quickly as possible. The drilling contract stipulated noise mitigationefforts on the entry side and exit side, which was located less than 100 meters from an apartment block. In addition,to counter any claim that the noise was above permitted levels, extensive daily monitoring was carried out by theengineer.
机译:2010年,艾伯塔省桑德雷镇(Sundre)修建了两条红色大口径管线 鹿河采用水平定向钻探(HDD)技术。每个交叉口约450 m 长度。交叉管道;卫生(外径406毫米)和饮用水(外径560毫米)由DR9制成 HDPE并已安装,以在红鹿河东侧提供新的和现有的开发;作为 镇目前仅向镇西提供水和废水服务。这将增加250名居民 及相关业务,目前的人口为2700。桑德雷镇(Town of Sundre)坐落在宁静的乡村环境中 拥有一流的高尔夫球场,基础设施支持和许多退休人员。 24小时钻机发出的噪音 作业和每天12个小时的班次套管锤作业,预计将成为该项目的主要障碍 由于交叉路口位置靠近市中心(约250米)。另外还有一个 入口侧的沙子和砾石深度很大,需要安装约80米的大型 直径套管。套管的安装仅限于日间换班,但钻井是在24天进行的。 小时操作,以尽快完成穿越。钻探合同规定了降噪措施 在入口和出口(距离公寓楼不到100米)处进行努力。此外, 为了应对任何有关噪音超过允许水平的说法,该机构进行了广泛的日常监控。 工程师。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号