In early 2010, Duke Energy Carolinas, LLC (Duke Energy) removed Dillsboro Dam and Powerhouse from the Tuckasegee River as part of a hydro relicensing settlement agreement addressing continued operation of Duke Energy's East Fork, West Fork, and Nantahala hydroelectric projects. Removal of the Dillsboro Hydroelectric Project (Project) served as a major component of the overall environmental and recreation mitigation plans by providing fish passage, improved fish habitat, and additional recreational opportunities on the Tuckasegee River.The original wooden dam at the Dillsboro site was constructed in 1909 and supplied power to local industries. Modernized dam and powerhouse facilities were built in the 1930s and by 1958, the dam had been raised a few feet and the powerhouse was rehabilitated once again. The Project had an installed capacity of 225 kW and included: (1) a 12-foot-high, 310-foot-long concrete masonry dam; (2) a 15-acre reservoir; (3) an 80-foot-long intake canal; (4) a powerhouse containing two vertical Francis-type generating units having a combined hydraulic capacity of 284 cubic feet per second; and (5) a 25-foot-long tailrace.
机译:2010年初,杜克能源卡罗来纳州有限责任公司(杜克能源)将杜尔斯伯勒大坝和发电厂从塔卡塞吉河撤走,这是一项水利许可和解协议的一部分,该协议涉及杜克能源东叉,西叉和南塔哈拉水电项目的持续运营。拆除迪尔斯伯勒水电站项目(项目)是在塔克塞吉河上提供鱼的通行,改善鱼的栖息地和其他娱乐机会,从而成为总体环境和休闲缓解计划的重要组成部分。在迪尔斯伯勒遗址建造了原始的木坝在1909年为当地工业供电。现代化的水坝和发电站设施建于1930年代,到1958年,水坝被抬高了几英尺,发电站再次得到了修复。该项目的装机容量为225千瓦,包括:(1)12英尺高,310英尺长的混凝土砌筑坝; (2)15英亩的水库; (3)80英尺长的进水渠; (4)动力舱,其中包括两个垂直的弗朗西斯型发电机组,其组合水力为每秒284立方英尺; (5)25英尺长的尾赛。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号