首页> 外文会议>Collection Systems Conference >SEPTIC TO SEWER FINALLY BECOMING REALITY (INVITED)
【24h】

SEPTIC TO SEWER FINALLY BECOMING REALITY (INVITED)

机译:腐败的下水道终于成为现实(邀请)

获取原文

摘要

This paper will highlight how San Luis Obispo County is moving forward with a completely new sewer system in the community of Los Osos after nearly 30 years of anticipation. The sewer saga in Los Osos is the subject of much controversy and publicity including the book “Small Town Perfect Storm – The Los Osos Sewer Saga” by Barbara Wolcott. Additional aspects of the paper will address (a) how the County overcame all obstacles during planning and design to finally have a real project moving forward, (b) how costs came in at values less than anticipated, saving the residents money for the system, (c) how the design overcame challenges with existing soils and groundwater and (d) report on construction progress to date.
机译:本文将突出圣路易斯奥巴波县如何在近30年的期待后在洛斯OSOS社区中展开全新的下水道系统。 Los Osos的下水道Saga是争议和宣传的主题,包括Barbara Wolcott的“小城镇完美风暴 - Los Osos Sewer Saga”。本文的其他方面将解决(a)该县在规划和设计期间如何克服所有障碍,最终有一个真正的项目向前发展,(b)如何在少于预期的价值观,节省系统的价值, (c)设计如何克服现有土壤和地下水和(d)迄今为止施工进展的报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号