首页> 外文会议>Collection Systems Conference >Behind the $740M: Building a Technical Consensus for Indianapolis Consent Decree Amendment No. 2
【24h】

Behind the $740M: Building a Technical Consensus for Indianapolis Consent Decree Amendment No. 2

机译:7.4亿美元背后:建立印第安纳波利斯同意第2号法令修正案的技术共识

获取原文

摘要

The February 2011 Engineering News Record article “With a Modified Consent Decree,Indianapolis Is Cleaning Up” (ENR, 2011) provided a high-level summary of Amendment No. 2to the Indianapolis Consent Decree (CD), which reduced estimated CSO program costs by $740million. The CD modification has been celebrated by U.S. EPA as a “win-win” since it resultedin cost savings for the city and additional capture of CSO discharges.In May 2009, Indianapolis DPW and RebuildIndy program management team staff proposed toU.S. EPA Region 5 a modification of the CD for 14 of the 31 combined sewer control measuresin the consent decree, including the deep tunnel system and the Southport advanced wastewatertreatment (AWT) plant expansion, which are the two largest components of the consent decree.The amendment was formally approved and entered in December 2010. In order to berecommended for approval by EPA and DOJ staff, it was necessary for Indianapolis todemonstrate that the proposed modifications had better environmental benefits than the originalCD that was entered in January 2007. The technical basis for proving the environmental benefitsto EPA and DOJ included:1 Hydraulic Modeling: A more detailed evaluation of the CSO system determined thataverage annual CSO volumes are approximately 30% lower than understood at the timeof the original CD. This finding, in conjunction with the first CD amendment, allowed forsmaller facilities to achieve the same performance criteria. The expansion and calibrationof the hydraulic model since January 2007 was presented in detail to EPA to confirm theupdated facility sizes.2 Sustainability: The accepted modifications to the CD included a more sustainable plan,not from the standpoint of green infrastructure, but from the standpoint of shifting CSOcontrol measures away from shallow interceptors, in-line storage, pump stations, andtreatment expansions, and towards storage facilities with a longer service life, betterreliability, and lower electrical and chemical usage.3 Sewage Out Sooner: The accepted modifications to the CD included a lower averageannual CSO discharge after full implementation than the original CD, and also allowedfor accelerating key projects to capture an additional 3.5 billion gallons of CSO by fullimplementation.
机译:2011年2月《工程新闻记录》的文章“经修改的同意法令, 印第安纳波利斯正在清理”(ENR,2011年)提供了第2号修正案的简要摘要 印第安纳波利斯同意法令(CD),该法令将CSO计划的估计成本降低了740美元 百万。自从CD修改以来,它就被美国EPA称为“双赢”。 节省了城市成本,并额外捕获了CSO排放量。 2009年5月,印第安纳波利斯DPW和RebuildIndy计划管理团队的工作人员提议 美国EPA 5区,对31种污水综合控制措施中的14种CD进行了修改 在同意法令中,包括深层隧道系统和Southport先进废水 处理(AWT)工厂扩建,这是同意令的两个最大组成部分。 该修正案已正式获得批准,并于2010年12月提交。 建议由EPA和DOJ工作人员批准,印第安纳波利斯有必要 证明拟议的修改比原始修改具有更好的环境效益 CD于2007年1月进入。证明环境效益的技术基础 EPA和DOJ的内容包括: 1水力模型:对CSO系统的更详细评估确定: 年均CSO量比当时的了解水平低约30% 原始CD。这一发现与CD的第一个修订版一起考虑了 较小的设施可以达到相同的性能标准。扩展和校准 自2007年1月以来的水力模型的详细信息已提交给EPA,以确认 更新设施规模。 2可持续性:CD接受的修改包括一个更可持续的计划, 不是从绿色基础设施的角度来看,而是从转变公民社会组织的角度来看 控制措施应远离浅水拦截器,在线存储,泵站和 扩大处理范围,并朝着使用寿命更长,更好的存储设施发展 可靠性,以及更低的电气和化学用量。 3尽快排污:对CD的可接受的修改包括较低的平均值 全面实施后的年度CSO排放量比原始CD还要高,并且允许 加快重点项目的开发,以全面捕获另外35亿加仑的CSO 执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号