OVERCOMING THE DILEMMA OF EARLY PRICING: A STUDY AND ANALYSIS OF TARGET PRICING USING IPD APPROACH

机译:克服早期定价的困境:使用IPD方法研究和分析目标定价

获取原文

摘要

From the earliest of times buyers of construction services have struggled with the best way to establish a fair price for construction work. Starting in the latter half of the 19th century owners increasingly sought fixed single prices, competitively bid, for their construction. This led to the growth of general contracting and the practice remained in force for over 100 years, until the owners once again intervened, tired of change orders, the opaqueness of the process and the constant disputes. They sought out new methods of pricing tied to new methods of project delivery. From the 1970's on experimentations led to various forms of construction management, to design-build and now more recently to radical methods of Integrated Project Delivery (IPD). All of these methods shared a common feature - the earlier involvement of contracting expertise with the purpose of having the builders as partners and advisors during the design phase. This was all very well but it created a pricing dilemma for the owners: how were they to be sure of obtaining a fair market price for their projects when the traditional providers of prices and those with the greatest knowledge of pricing, the general contractors, were now involved at a stage where designs were incomplete and any pricing given would be subject to numerous assumptions, hedged with conditions and often priced without competition. The aim of this research is to provide a brief overview of historical evolution of pricing and contracting methods, to investigate the challenges associated with early pricing in alternative delivery approaches, and to study and analyze if/how IPD addresses the challenge of obtaining and sustaining an early fair price for owners. To accomplish the goals, this research has conducted a literature review on early pricing practices, interviews with various institutional owners, general contractors, program managers, and lean institutes who have had experience with early pricing in alternative delivery methods and IPD approach.
机译:从最早的次,建筑服务的买家挣扎着建立建设工作的最佳方式。从19世纪的后半场开始,所有者的所有者越来越多地寻求固定的单价,竞争地价竞标,以其建筑。这导致了一般收缩的增长,而且实践仍然有超过100年,直到业主再次干预,厌倦了变更令,过程的不透明和持续争端。他们保证了与新的项目交付方法相关的定价方法。从20世纪70年代的实验导致了各种形式的施工管理,设计制造,现在更近最近对综合项目交付的激进方法(IPD)。所有这些方法都分享了一个共同的特征 - 较早参与承包专业知识的目的,在设计阶段将建设者作为合作伙伴和顾问。这一切都很好,但它为业主创造了定价困境:当传统价格和最大的定价知识,总承包商的价格最大的价格和最大的价格,他们如何确定他们的项目的公平市场价格如何现在参与了设计不完整的阶段,并且给出的任何定价都会受到许多假设的,并在没有竞争的情况下预订并经常定价。本研究的目的是概述定价和承包方法的历史演变,调查与替代交付方法中的早期定价相关的挑战,以及研究和分析IPD的挑战,以解决获得和维持和维持挑战业主的早期价格。为实现目标,这项研究对早期定价做法进行了文献综述,采访了各种机构所有者,一般承包商,计划经理和精益机构,他们在替代交付方法和IPD方法中进行了早期定价的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号