Calgary Bow River Weir Project

机译:卡尔加里蝴蝶结堰项目

获取原文

摘要

The Western Headworks system, of which the Calgary Bow River Weir is a part, was originally constructed by the Canadian Pacific Railroad in 1908 to divert water from the Bow River for irrigated agriculture in the semi-arid region east of Calgary. The "Calgary Weir" represented the only barrier to boaters and fish passage in the 100 km section of the Bow River between the Bearspaw Dam and the Carseland Weir. The ogee-shaped weir included a submerged, concave-shaped bucket deflector which created rollers (bucket roller and ground roller) to dissipate energy and prevent downstream scour. These rollers have claimed over 20 lives; consequently, the weir was infamously labelled the "Drowning Machine" as a testament to the unforgiving danger it posed. The Calgary Bow River Weir Project's primary purpose was to eliminate the extreme drowning hazard and enable passage for non-motorized boats and fish while maintaining water diversions from the Bow River. To achieve this, eight pools and eleven rapids were constructed to change the hydraulic conditions downstream of the weir from the existing concentrated circulating flow pattern to an extended linear pattern. The project creates an amenity for canoeists, kayakers, bird watchers, floaters, and educators. Construction with the Bow River flowing through the project was challenging. Utilizing innovative construction materials and techniques (boulders and macro-fibre reinforced concrete) provided the aesthetic character that was required, greatly increased the pace of construction, and reduced the project cost. The project was constructed on schedule and under budget at a cost of $16.5 million.
机译:科尔加里弓河堰是一部分的西部综卫展制度最初由1908年加拿大太平洋铁路建造,以转移来自卡尔加里以东半干旱地区的灌溉农业的弓河的水。 “卡尔加里堰”代表了Bearspaw水坝和Carseland Weir之间的弓河100公里处的船长和鱼类的唯一障碍。 ogee形堰包括浸没式凹形铲斗偏转器,该铲斗偏转器产生辊子(铲斗辊和接地辊)以消散能量并防止下游冲刷。这些滚筒已声称超过20个生命;因此,堰是狭窄的标记为“溺水机器”,作为其提出的无情危险的证明。卡尔加里弓河堰项目的主要目的是消除极端溺水的危险,并为非机动船和鱼类提供通道,同时保持弓箭的水分流。为实现这一点,构造了八个池和十一个速度,以将堰下游的液压条件从现有的浓缩循环流动图案改变为延长的线性图案。该项目为独木舟,皮划艇运动员,鸟类观察者,漂浮物和教育工作者创造了舒适性。用弓箭流经该项目的建设挑战。利用创新的建筑材料和技术(巨石和宏观纤维钢筋混凝土)提供了所需的审美性格,大大增加了建设的步伐,并降低了项目成本。该项目按计划和预算规定,费用为1650万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号