Implementation of CNSC Regulatory Guide G-323 at Pickering Nuclear Generating Station

机译:在Pickering核电站执行CNSC监管指南G-323

获取原文

摘要

The Minimum Staff Complement (MSC) is the minimum number of people required to be present on a given shift to ensure safe and reliable operation of the nuclear facility, while maintaining an adequate preparedness level in handling all possible emergency scenarios. In 2009-2010, Ontario Power Generation (OPG) examined its MSC at Pickering using the newly issued regulatory guidelines specified in CNSC Guide G-323 'Ensuring the Presence of Sufficient Qualified Staff at Class I Nuclear Facilities - Minimum Staff Complement'. This was the first project of this nature in the Canadian Nuclear industry to be executed using G-323. The following paper provides an overview of the methodology that was developed to demonstrate Pickering's alignment with G-323 in addition to the successes and challenges of the project.
机译:最低限度人员补给(MSC)是在给定的班次中要求的最小人数,以确保核设施安全可靠地运行,同时在处理所有可能的紧急情况时保持足够的准备水平。在2009-2010年期间,安大略省电力公司(OPG)使用了新发布的《美国国家安全委员会指南G-323》(确保I类核设施中合格人员的数量-最低限度的人员补充)中规定的监管指南,对Pickering的MSC进行了检查。这是加拿大核工业中使用G-323执行的第一个此类项目。除了项目的成功和挑战之外,以下论文还概述了用来证明Pickering与G-323保持一致的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号