首页> 外文会议>International conference on pipelines and trenchless technology;ICPTT 2011 >Study on Launching and Receiving Technology of Shield Tunnel
【24h】

Study on Launching and Receiving Technology of Shield Tunnel

机译:盾构隧道发射接收技术研究

获取原文

摘要

The launching and arriving of shield machine are the key aspects of shield tunneling when crossing rivers, which directly affect both shield driving and the stability of working shaft. Based on the background of Xijiang crossing project of gas pipeline network in Guangdong province, this paper mainly illustrate the key starting and arriving procedures of slurry shield, and the numerical simulation method is used to analyze the stability of shield excavation face under different horizontal and longitudinal consolidating range. On this basis, combined with other engineering practice, a reasonable reinforcement range is also proposed in the shield starting and receiving section.
机译:盾构机的发射和到达是交叉河流时屏蔽隧道的关键方面,它直接影响屏蔽驾驶和工作轴的稳定性。基于广东省燃气管网燃气管网的外汇项目的背景,本文主要说明了浆料屏蔽的关键启动和到达程序,数值模拟方法用于分析不同水平和纵向下盾构挖掘面的稳定性整合范围。在此基础上,结合其他工程实践,在盾牌启动和接收部分中也提出了合理的加强范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号