首页> 外文会议>International conference on pipelines and trenchless technology;ICPTT 2011 >Study on Influence Factors to Application of Large-Scale HDD to Oil and Gas Pipe Installation
【24h】

Study on Influence Factors to Application of Large-Scale HDD to Oil and Gas Pipe Installation

机译:大型硬盘在油气管道安装中应用的影响因素研究

获取原文

摘要

Horizontal directional Drilling (HDD) is widely used to install oil and natural gas pipes that have to across river or lake areas in China. With low-cost, environment friendly, high-efficiency, HDD is recommended as the first alternative of the West-to-East natural gas transmission project. However, there are still lots of technology obstacles around large-scale HDD crossing, especially in gravel-cobble strata, soft-hard combining strata, water sensitivity strata. In order to deal with these obstacles and find out the critical factors leading to troubles and failures during HDD crossing, this paper analyzes more than 12 cases of oil and gas pipe installation by HDD technology. Six normal troubles and seven potential factors will be involved to analyze the relationship between troubles and potential factors.
机译:水平定向钻探(HDD)被广泛用于安装必须穿越中国河流或湖泊地区的石油和天然气管道。 HDD具有低成本,环保,高效的特点,因此被推荐为西气东输项目的第一个替代方案。但是,大规模HDD穿越仍然存在许多技术障碍,特别是在卵石卵石层,软硬结合层,水敏性层中。为了解决这些障碍,找出导致HDD穿越过程中出现故障和失败的关键因素,本文分析了使用HDD技术进行的12多个油气管道安装案例。将涉及六个正常故障和七个潜在因素,以分析故障和潜在因素之间的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号