首页> 外文会议>International conference on engineering and information management >Determining Optimal Place for Installation of Distributed Generation (DG), by Fuzzy Method
【24h】

Determining Optimal Place for Installation of Distributed Generation (DG), by Fuzzy Method

机译:用模糊方法确定分布式发电装置的最佳安装位置

获取原文

摘要

In this paper, a new method is presented for determining optimal place of DG sources, in which the mentioned placing is based on Fuzzy method. And Of course, with purpose of decreasing system loss and improve voltage profile of network. We identify optimal place of DG by introducing two types of membership fuzzy functions. Which one of them is as system loss and the other one is as desired voltage range. Simulation will be carried out on 33- bus system and test results will be presented at the final part.
机译:在本文中,提出了一种用于确定DG源的最佳位置的新方法,其中所述放置基于模糊方法。当然,目的是降低系统损失和改善网络电压曲线的目的。我们通过引入两种类型的隶属模糊功能来确定DG的最佳位置。其中哪一个是系统丢失,另一个是所需的电压范围。模拟将在33总线系统上进行,并将在最后一部分呈现测试结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号