首页> 外文会议>International conference on ground control in mining >Development and Application of Impact–Resistant Lagging for Steel Sets Installed at Underground Roof Fall Areas
【24h】

Development and Application of Impact–Resistant Lagging for Steel Sets Installed at Underground Roof Fall Areas

机译:安装在地下屋顶坠落区的钢结构耐冲击滞后的开发和应用

获取原文

摘要

Underground mines often experience roof falls in entries,crosscuts, and intersections of active mining sections, maintravel ways, and belt entries. Roof fall heights greater than 20 ft(6 m) make re-bolting of the newly exposed roof dangerous andimpractical. To protect mine personnel, belts, moving vehicles,and other facilities, mine operators typically install steel structuressuch as square or arch sets in the roof fall areas. Wood laggingis usually installed between the steel-sets to enclose the area andprotect the entry from recurring falls. Usually the void space abovethe steel-sets and laggings is backfilled. However, backfillinghigh roof fall voids is costly, which causes some operators toleave the voids open. In this case, durability of wood over timeand the capability of the steel-set and wood lagging to resistfalling rocks are unknown. During the last few years, KeystoneMining Services, LLC (Jennmar Corporation affiliate engineeringcompany) designed, tested, and developed an impact-resistantlagging system to protect steel-sets1. Various steel-sets protectedwith the impact-resistant lagging were approved by MSHA andinstalled in different underground roof fall rehabilitation projects.This paper presents (1) design, development, and laboratory testingof the patent-pending impact-resistant lagging panel, (2) steel-setdesign methodology according to the American Institute of SteelConstruction (AISC) national standard, and (3) impact-resistantsteel-set design method based on Law of Conservation of Energy.Two underground cases are reviewed to demonstrate the successfulapplication of the impact-resistant lagging system.
机译:地下矿山经常在入口处经历屋顶跌落, 主要采矿的横切面和交点,主要 出行方式和皮带入口。屋顶坠落高度大于20英尺 (6 m)会使重新暴露在新近暴露的屋顶上变得危险,并且 不切实际的。为了保护地雷人员,安全带,行驶中的车辆, 和其他设施,矿山经营者通常会安装钢结构 例如屋顶落下区域的正方形或拱形装置。木材落后 通常安装在钢套件之间以封闭该区域,并且 保护条目免于反复跌倒。通常是上方的空隙 钢架和钢坯被回填。但是,回填 高屋顶坠落空隙的成本很高,这导致一些操作员 留空。在这种情况下,木材经久耐用 以及钢衬和木块的抵抗能力 下落的岩石是未知的。在过去的几年中,基斯通 Mining Services,LLC(Jennmar Corporation附属工程 公司)设计,测试并开发了抗冲击性 保护钢套的保护系统1。各种钢套保护 具有耐冲击性的落后产品已获得MSHA的认可, 安装在不同的地下屋顶坠落修复项目中。 本文介绍(1)设计,开发和实验室测试 正在申请专利的抗冲击防护板的示意图,(2)钢套 根据美国钢铁协会的设计方法 建筑(AISC)国家标准,以及(3)耐冲击 基于能量守恒定律的钢结构设计方法。 审查了两个地下案例以证明成功 耐冲击滞后系统的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号