首页> 外文会议>2011 International Conference on Electric Technology and Civil Engineering >Key process and difficulty analysis of pipe sections prefabrication of immersed tunnel and research on the solving measures
【24h】

Key process and difficulty analysis of pipe sections prefabrication of immersed tunnel and research on the solving measures

机译:沉管隧道管段预制关键过程及难点分析及解决措施研究

获取原文

摘要

The key process and difficulty of pipe sections prefabrication of immersed tunnel in the Zhoutouju tunneling project was analyzed firstly, including the error control of prefabricated pipe junctions in geometry size, proportioning of concrete design and production of concrete, the process of concrete construction, crack width control of concrete. Then several key technical measures, such as the organization and the management of pipe sections prefabrication, pipe dimensions control, control of unit weight of concrete, control of crack width by temperature and so on, were proposed to make sure that the quality of prefabricated pipe sections meets the requirement.
机译:首先分析了周头驹隧道工程沉管隧道管段预制的关键过程和难点,包括预制管结几何尺寸的误差控制,混凝土设计与生产的比重,混凝土的施工过程,裂缝宽度等。控制混凝土。然后提出了几种关键的技术措施,例如预制管段的组织和管理,管道尺寸控制,混凝土单位重量的控制,温度裂缝宽度的控制等,以确保预制管的质量。部分符合要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号